Milford Haven South Hook Jetty

This was a major repair to the jetty to receive LNG tankers. The work included the installation of a cathodic protection system to control corrosion of the steel piles and concrete deck. CEL provided 920 reference electrodes for monitoring of the system.
Trackback from your site.